Autobahnbrücke am Rhein

Rhine bridge, Leverkusen (A1)

Construction project: Leverkusen Rhine Bridge (A1) – direction of travel Trier

Location: Leverkusen 

Year of implementation: 2024

Project objective: Development of a safe, ergonomic access system for 80 m high Rhine pylons, enabling regular inspections in the bridge box and on the pylons, and meeting the high safety and technical requirements.

HAILO products used: HAILO TOPLift service lifts distributed across 2 bridge pylons

Special features: 

  • HAILO service lifts were approved for a 17° incline for the first time: ladder-guided on a 17° sloping pylon wall 
  • First service lift at the bottom on the side, 2nd service lift above in the center. Lifting height 35 and 25 meters. Travel time 3 min. 
  • Comfortable ascent despite the incline 
  • Transfer at a height of 35 m to the second lift within the narrow structure geometry


Fahrradweg über Autobahnbrücke mit Brückenpylone
2 Servicelifte und Leiter in einem engen Raum
Blick nach oben in einem Turm mit ortsfester Leiter
Do you have questions about our service lifts?

Please feel free to contact us:

Manuel Wengenroth
Phone: +49 (0) 2773 / 82-1372 
E-Mail: mwengenroth@hailo.de